The commissioning and Performance tests vary according to the size of the project, client, contract requirements, and local regulations.
Commissioning and performance testing services include but are not limited to:
Pre-Energization Commissioning:
- System Inspection
- DC Insulation Resistance Testing
- AC Insulation Resistance Testing
- Open circuit voltage (VOC) and Polarity verification
- Inverter commissioning, Startup, and Operation
- Power Transformer Testing
- Switchgear testing
- MV and LV Cable Testing
- Protective Relay Testing
- Surge Arresters Testing
- Documentation and Reporting of all Commissioning Tests and Procedures.
Post-Energization Commissioning:
- Operating Current Test
- Inverter Commissioning
- Meter Commissioning
- SCADA Commissioning
- System Output Performance Calculation